Construction of the 2nd Metro line in Warsaw

Construction of the 2nd Metro line in Warsaw

marzo 1, 2016
/
por cidoc
/ /
comentarios cerrados

Designación: Construction of the 2nd Metro line in Warsaw: Stage I of the construction of the western section from the route after station C9 (Rondo Daszyńskiego) to the sidings beyond station C6 and stage I of the construction of the north-eastern section from the route after station C15 (Dworzec Wileński) to the sidings beyond station C18.

Construction of the 2nd Metro line in Warsaw

Descripción: Construcción de la Línea 2 del Metro de Varsovia. The Construction projects, the Health and Safety Plan, post-completion documentation, User and Maintenance Instructions as specified in the User and Functionality Program (UFP) together with attachments; completion of the Tunnelling Timetable, together with an application for its approval provided to the Contractor by the Beneficiary, as well as obtaining approval of the said Timetable from the appropriate mining supervision agency.

Organismo: MUNICIPALITY OF WARSAW.

 

 

 

Comments are closed.

  • idioma

  • Visit Us On TwitterVisit Us On Google PlusVisit Us On Linkedin

    Delegación Madrid:

    Av de Europa, 15
    Portal 4, 3ºc.
    (28224) Pozuelo de Alarcón
    Tlf: +34 917 99 00 76
    Fax: +34 917990086

    Delegación Alicante:

    C/ Pintor Aparicio, 28
    (03003) Alicante